You are here : Projects / Highway and Bridge

Construction of first & third roads and  Concrete bridge  over the main channel – Khodafarin Dam
Construction of Eastern Bridges on Northern & Southern Taxiway in Imam Khomeini International Airport 
Construction of a 70 meter street  Sahand New Town  From 14+950 km to 19 +100  km

A bridge consisting of 8×30m spans, 10m span box abutments, heeled shallow foundation, and post tensioned prefabricated concrete beams
A bridge consisting of 5×28m spans with foundation resting on in-situ concrete piles, and post tensioned prefabricated concrete beams
A bridge consisting of 5×20m spans with shallow foundation and pre-cast concrete beams
Page 2 of 2First   Previous   1  [2]  Next   Last   
Copyright 2024 by Azarsimab Corporation
Design and powerd by : Hirad Group