Excavation, Designing and construction of building Complex with soil nailing and anchoring method along with execution of wall shot creating
Executing over 2500 micro piles with the depth of 10-12m and diameter of 150 mm.
Wall fixing and stabilizing stabilization in EDALAT hotel project of mashhad judiciary including of Excavation , drainage & Shotcrete .  
EPC project of stabilizing trenches of baagh-e-behesht (evin) by Nailing & Soil Anchorage method along with execution of drainage & Shotcrete.
Design, procurement and executing the Trench stabilization of SABA complex using Nailing Method
Soil Stabilization using Geogrids, filtering material and premanufactured concrete members of the soil in phase two of kosar park.
Drilling and under pressure injection of 280 Micro piles with the depth of 12 meters & diameter of 10 centimeter in order to stabilize the buildings soil.
Temporary stabilization design and execution (without considering the seismic force) of some part of Anna Hotel northern & southern low ground with soil nailing method.
Soil Stabilization Design, procurement and execution for the 137 multi story parking (Se-rah Azari) using soil nailing & soil anchor methods along with the execution of drainage, meshes & wall shotcr...
EPC project of Stabilizing Trenches of PARS Administrative & Commercial Complex by Soil Nailing along with Shotcreting.
Page 2 of 3First   Previous   1  [2]  3  Next   Last   
Copyright 2024 by Azarsimab Corporation
Design and powerd by : Hirad Group