100 m long load out quay wall through secant in-situ concrete piles method as well as the deck and skid way for lunching 8000 ton offshore structures.
380 m long quay wall through secant in-situ concrete piles method as well as the deck and utility ducts
Page 2 of 2First   Previous   1  [2]  Next   Last   
Copyright 2024 by Azarsimab Corporation
Design and powerd by : Hirad Group