Ground preparation of the 240 m long culvert for kheirabad’s Dam
Construction of Earth Dam with clay core,  with capacityof 260 m 3 ,length of 365 m,  and height of 22 m  
 Construction of 36 Km concrete lined irrigation canal and 40Km drain canal including the related structures
Sheet piling, dewatering, muck and earth removing, construction of a trapezoidal section canal at the inlet (at the bottom of the lake) of Moghan hydropower plant intake
Protection works of Aras River banks through dry-laid quarry stone at length of some 1 km
Construction of some 22 Km Drainage canals and the related structures