Construction of metro track foundation and technical structures for Gazeran metro station
This project consists of the second phase studies, design and construction of 12.5 km metro track along  with technical structures such as retaining walls, a number of bridges, access roads and smal...
800x600 Drilling & piling of some 40 × 1 m dia., 28 meter deep in-situ concrete piles with Rotary method Normal 0 false false ...
Construction of structural box of station NO.5 to 14 of shiraz metro by using  in-situ bored piling system (secant pile) consist of 4500 piles with 1m,1.2m diameter and 29 m Length
Execution of TBM entrance structure, bored piles and shotcrete of walls and execution of structural works
Copyright 2022 by Azarsimab Corporation
Design and powerd by : Hirad Group
hack forum hacklink Çocuk oyun halıları Prefabrik cami halısı cami halısı cami halısı cami halısı cami Halısı cami halısı cami halısı cami avizesi cami avizeleri Cami Süpürgesi Cami Süpürgesi Cami Süpürgesi cami halısı cami halısı cami halısı evden eve nakliyat evden eve nakliyat evden eve nakliyat evden eve nakliyat ofis taşıma yurtiçi evden eve nakliyat yurtiçi evden eve nakliyat içel evden eve nakliyat seo hizmeti Rulet Casino Slot Bahigo 1xbet Deneme bonusu Bahis siteleri Maç özetleri Bahsegel Canlı Casino Siteleri Sweet Bonanza Blackjack Casino Siteleri Rulet Oyna google.com.tr Paykwik facebook beğeni hilesi